
Describe the cabinet as installed
Record the cabinet identifier and request the installation drawing. Note usable mounting space, access from each side, cable entry and the route a module would take during replacement.
- Who owns the cabinet drawing and revision?
- Which dimensions need measurement at the site?
Document the proposed assembly
List the proposed module count, inverter, controller and communications arrangement. Ask the reviewer to mark the supported configuration and service clearances on a drawing.
- What loading evidence is available for the rack?
- How will the integrator identify a replacement module revision?

